Quantcast
Channel: Engineering News | Education & Skills Development
Viewing all articles
Browse latest Browse all 2177

Eskom attributes three stages of load-shedding to wildcat strike

$
0
0
Embattled power utility Eskom has attributed three stages of the current load-shedding, which is being implemented daily at between Stage 4 and Stage 6, directly to the illegal strike under way at varying levels of intensity across its coal fleet. Speaking against the backdrop of a resumption of wage talks with unions on Friday, CEO André de Ruyter reported that 2 709 MW of capacity was unavailable as a direct result of the wildcat industrial action, triggered by a recent deadlock in wage talks.

Viewing all articles
Browse latest Browse all 2177

Trending Articles



<script src="https://jsc.adskeeper.com/r/s/rssing.com.1596347.js" async> </script>